Outdoor Work
 
The graveyard previously very overgrown.
August 2009
 

The oiltank covered and obscured by weeds

 
 
Weed killer was applied and some of the larger
plants were removed with a lot of effort. June 2010
  The oil tank (no longer required) was removed but removing
the ivy caused some problems with the wall. Summer 2010
 
 
The railings and gate from the path were removed.  

Most of the rubble cleared out of the way
Early September 2010

 
 
Begining to level the soil Late
September 2010
  The gutter was in need of replacement
 
 
The downpipes were no longer up to the job
  So scaffold was erected to have the work done
October 2010
 
 
The wall was rebuilt slightly shorter
November 2010
  The wall was finished late 2010